When it comes to renovating your bathroom, one of the most impactful upgrades you can make is a new shower door installation. Not only does it enhance the aesthetic of the space, but it can also improve the functionality of your shower. Whether you’re replacing an old, worn-out door or installing a brand new one, you may be wondering “How long does a shower door installation take?”
The length of time it takes to install a shower door depends on several factors, including the type of shower door, the complexity of the installation, and the experience of the installer. In this blog, we’ll break down the various aspects that affect the duration of shower door installation and give you a clear understanding of what to expect during the process.
The type of shower door you choose is one of the primary factors influencing how long the shower door installation will take. Different styles of doors have different installation requirements, which can impact the timeline.
Frameless shower doors are known for their sleek, minimalist design, but they also require a bit more precision during installation. Since these doors are heavier and rely on glass for structural integrity, the installation process can take a little longer. Expect a frameless shower door installation to take anywhere from 1 to 5 hours, depending on the size and complexity of the shower.
At Doors by Mike, we have several different options for frameless shower enclosures, including:
To explore our options, take a look at our frameless shower enclosures page.
Sliding shower doors, which are often ideal for smaller bathrooms or space-saving solutions, can take a little more time to install than hinged doors. This is because sliding doors require a track system to be properly aligned and installed. Expect this shower door installation to take about 2 to 4 hours.
At Doors by Mike, we have several different options for frameless shower enclosures, including:
Serenity Sliding Shower Door System
The Serenity Sliding Shower Door System (also known as a "barn door slider") offers a modern, almost floating look with its minimal hardware and 3/8" glass. This system includes one sliding door with a fixed inline panel, and a 90-degree configuration is also available. The specially designed roller bearings make opening and closing the door smooth and effortless. The roller system operates both above and below the header bar for a sleek, frameless appearance.
Available Finishes:
Cambridge Sliding Shower Door System
The Cambridge Sliding Shower Door System features two sliding bypass doors made from durable 3/8" glass. The unique roller system ensures easy operation, with the rollers positioned above and below the header bar. This system includes two horizontal towel bars for added convenience and style.
Available Finishes:
To explore our options, take a look at our sliding enclosures page.
The size of your shower also plays a significant role in how long the installation will take. If you have a large, custom shower, the shower door installation process can take longer than it would for a standard-sized shower.
For instance, custom frameless doors can take extra time to measure, fabricate, and fit to ensure alignment. A small shower door installation could be completed in just 1 to 3 hours, while a larger or custom installation may take 4 to 6 hours.
Before the actual installation begins, the technician needs to assess the space, take measurements, and prepare the shower area. If you’re replacing an old door, additional time might be required to remove the old door and prepare the shower for the new installation. This can add an extra 30 minutes to an hour to the total time, depending on how difficult it is to remove the existing door. Shower door installation in a more complicated space may take anywhere from 3 to 6 hours.
The experience of the installer plays a crucial role in how long the shower door installation will take. A skilled, professional installer can complete the job quickly and efficiently, while an inexperienced installer may take longer to ensure everything is done correctly.
Experienced installers are familiar with the potential challenges that can arise during the installation process and know how to troubleshoot issues. They can also ensure that your new shower door installation is properly aligned, sealed, and secure.
Once the shower door is installed, the installer will need to make final adjustments to ensure everything operates smoothly. This includes checking the door’s alignment, testing the hinges or tracks, and adjusting any seals to ensure a proper fit.
This final step usually takes about 30 minutes to an hour, depending on the size of the installation and the type of door.
In general, most shower door installations can be completed within a few hours, but the exact timeline depends on various factors, including the type of shower door, the size of the shower, the complexity of the installation, and the experience of the installer.
If you’re considering a new shower door installation, it's important to schedule time for preparation, installation, and any necessary post-installation adjustments. A professional installer will help streamline the process, ensuring that your shower doors are properly installed and ready for use.
If you're ready to upgrade your bathroom with a new shower door, schedule your consultation with Doors by Mike today. Additionally, explore our shower door page to find the perfect shower door that matches your style and needs.